Guide / Deals
Stalled deals
Each stage has a stall limit in days (set in Pipelines). A deal in a stage longer than that is stalled: an orange edge on the board, "Stalled deal" on Today with the days counted.
Open it, log the next step (a call, a meeting), and either move it on or close it as lost. A stalled deal is usually a lost deal nobody has admitted to yet.